Microsoft

MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing

Use original educational practice content, randomized simulator sessions, score history and explanation review for MB-320.

Las preguntas de práctica se proporcionan en inglés para mantenerse cerca del idioma utilizado habitualmente en las certificaciones IT.

QZ9 es una plataforma de formación independiente. Todas las preguntas de práctica son originales y creadas solo con fines educativos. No proporcionamos contenido real de examen ni contenido no autorizado. Microsoft, AWS, Cisco, CompTIA, PMI y otras marcas pertenecen a sus respectivos propietarios.

ProveedorMicrosoft
CodeMB-320
DurationDuración variable
Questions57 refs
Datos del examen

Preparación basada en objetivos, sin contenido no autorizado

Certification metadata is preserved from the legacy QZ9 catalog. Questions remain English-only.

Iniciar prueba práctica
1Encuentra tu examen
2Inicia el simulador
3Revisa resultados
QZ9Plataforma de formación independiente
Vista previa gratuita

Simulador de examen

Las preguntas de práctica se proporcionan en inglés para mantenerse cerca del idioma utilizado habitualmente en las certificaciones IT.

Pregunta 1

DRAG DROP You are the production supervisor at a manufacturing company. You are in the process of configuring the production control module and its parameters. A company plans to use manufacturing execution. Bill of materials (BOM) item consumption must be generated when items are reported at the operation level. You need to configure the Manufacturing execution production order defaults form to allow for back flushing on operations. How should you set up Automatic BOM consumption? To answer, drag the appropriate setting to the correct targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content. NOTE: Each correct selection is worth one point. Select and Place:

Pregunta 2

You maintain responsible resource calendars and production orders for a manufacturing company. All production resources use the same production calendar. A machine in the facility is defective and must be closed for repairs for the next two days. You need to configure the resource calendar to close the resource for production for the next two days. What should you do?

Pregunta 3

A manufacturing company is implementing Dynamics 365 Supply Chain Management. The company uses a standard costing model to value inventory. During the setup of the system, all areas that impact the standard cost of the item must be configured correctly to calculate a complete standard cost by using routing, Bill of materials (BOM) and overhead burden. You need to verify that all areas of the system are correctly configured. Which object does NOT impact the standard cost of manufactured items?

Pregunta 4

DRAG DROP A glass bottle manufacturer uses route operations to schedule resources and track manufacturing costs. The company has recently seen an increase in demand and purchases another resource. The company uses the same costs per resource. However, the new resource costs more to run. The company must be able to track cost contributions for the new resource. You need to create a cost category for the new resource. Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order. NOTE: Each correct selection is worth one point. Select and Place:

Pregunta 5

A company is looking to use Dynamics 365 Supply Chain Management. The company is in the process of redesigning and retooling an existing manufacturing plant to group similar, cellular operations to improve efficiency and minimize wasted time between operations. They want to locate raw materials close to where they are needed without losing reorder visibility. You need to set up their environment. Which kind of production type should you implement?